Location:    NORTHBEND, WA
Start Date:  2014
Contract:    $15,586,595
Description:
THE MIDDLE FORK SNOQUALMIE RIVER ROAD PROJECT WILL RECONSTRUCT APPROXIMATELY 9.7 MILES OF THE MIDDLE FORK ROAD, FROM MILEPOST (MP) 2.7, JUST PAST THE COUPLET, TO MIDDLE FORK CAMPGROUND AT MP 12.4. THE PROJECT WILL CONSTRUCT A 20-FOOT PAVED ROADWAY WITH SECTIONS OF 18-FOOT WIDTH USED IN CONSTRAINED LOCATIONS. MINOR HORIZONTAL AND VERTICAL ALIGNMENT ADJUSTMENTS WILL BE MADE AS NEEDED TO IMPROVE SAFETY AND BLEND WITH THE CONTEXT OF THE VALLEY. TWO BRIDGES WILL BE RECONSTRUCTED AND ONE BRIDGE REPLACED WITH A CULVERT. NUMEROUS EXISTING ROADWAY CULVERTS WILL BE REPLACED. SIGNING AND OTHER ROADSIDE SAFETY FEATURES WILL BE UPGRADED.

 

LOCATION:     OLYMPIA, WA
START DATE:   2014
CONTRACT:     $2,481,953
DESCRIPTION:
The scope of this project was to construct a single lane roundabout at an existing 3-way intersection to accommodate multi modal transportation improvements. Project elements included the following: clearing and grubbing; pavement removal; grading; compaction; cement concrete curb and sidewalk; storm water conveyance system and storm water treatment facility construction/expansion; abandonment and replacement of asbestos cement water main; extension of existing sanitary sewer main; joint utility trench excavation and installation; private utility service conversions; illumination system; hot mix asphalt roadway; channelization; landscaping, and other associated work.

LOCATION:    Tacoma, WA
START DATE:  2014
CONTRACT:    $5,053,502
DESCRIPTION:
aWARDED THE NORTHWEST CONTRUCTION CONSUMER COUNCIL'S 2016 DISTINGUISHED PROJECT AWARD.
The scope of work for this project includes rehabilitation and creation of floodplain wetlands, creation of a meandering Clear Creek channel network, and related riparian buffer on an approximately 40 acre site. A significant amount of material will be excavated and removed from the site. The project also includes planting and establishment of native plant species throughout the site including grasses, shrubs and trees as well micro topography including placement of woody material and snags.

LOCATION:     Lacey, WA
START DATE:  2014
CONTRACT:    $2,092,267
DESCRIPTION:
The scope of the project includs clearing and grubbing, removal of debris piles, excavation for the construction of a four-celled stormwater treatment facility, storm sewer, paved pedestrian trail, sanitary sewer replacement, pedestrian scale lighting, walking trails, planting for constructed wetlands and lake shore buffer areas, and other misc. work.

LOCATION:     Olympia, WA
START DATE:   2014
CONTRACT:     $1,431,682
DESCRIPTION:
The scope of the project provided bridge replacement of Littlerock Road SW at Salmon Creek crossing. Construction includes removing existing three span bridge and constructing a 71ft span bridge, roadway work approaching the proposed bridge, cantilevered sheet pile walls & guardrail installation.  Other major work included, pulverizing existing asphalt (3,000 SY); crushed surface base course (1,500 ton); wetland mitigation; and other work.