Location: vashon, wa - maury island
Start/finish Date: may 2021 - August 2021
Contract: $1,250,145
Description: The project provided for the improvement of the Maury Island Open Space Property (often referred to as the Maury Island Natural Area) located at approximately 7911 SW 260th Street in Vashon Island in King County. This property is under Washington Department of Ecology Agreed Order 8439, to clean-up soil contamination caused by Asarco’s Tacoma Smelter. The project workers all must have current Hazardous Waste Operations and Emergency Response (HAZWOPER) Training Certification. This project includes capping a former skeet range to create a gravel parking area for civilians, as well as, equestrians and 3 acres of invasive plant removal.

 

Location: salkum, wa
Start/finish Date: august 2021 - october 2021
Contract: $320,320
Description: Project provides for the improvement of Stowell Road MP 0.57 by performing temporary BMPs, stream diversion, structure excavation, concrete slope protection (precast concrete units), re-setting existing riprap, streambed gravel, large woody debris, hydrodseeding and other work.

 

Location: LACEY, wa
Start/finish Date: MAY 2021 - OCTOBER 2022
Contract: $7,828,045.16
Description: Project provides for the installation of 12,000 LF of 4-inch, 8-inch and 12-inch water main, 12,400 LF of 8-inch sewer main and 1,700 LF stormwater main throughout the west half (Phase II) of Capitol City Golf Club Estates from 66th Ave SE to Yelm Highway SE. Work includes water and sewer service lines, meters, valves, hydrants, connections to existing water and sewer systems, water and sewer main abandonments, decommissioning of existing septic systems, drainage structures, plumbing work, pavement, lawn restoration, and other work.

 

Location: kent, wa
Start/finish Date: june 2022 -
Contract: $466,466
Description: The project consists of raising the existing road slump by digging out the failing pavement and rebuilding the roadway section. The driveway, sidewalk, curb and gutter will also be removed and raised to finished grade. 120’ of storm sewer pipe and a catch basin will be removed and replaced. 110’ of 8” diamter waterline will be removed and replaced with 8” restrained joint pipe. two dcda faults will be replaced with above ground baults. 100’ of 16” concrete cylinder pipe watermain will be exposed and it’s condition will be evaluated to determine if repairs are needed.

 

Location: ashford, wa - UPPER NISQUALLY RIVER – BELOW PARADISE NATIONAL PARK MAIN GATE
Start/finish Date: july 2021 - October 2021
Contract: $2,822,822.00
Description: Construction of the Upper Nisqually and Mt. Rainier Retrofit. This contract provides for the construction of roughness elements within the channel that will help protect the levee and revetment structures from the damaging high energy flows.

 

Location: bremerton, wa
Start/finish Date: june 2021 - September 2022
Contract: $6,237,237
Description: 4100 lineal feet of 12-inch HDPE sewer force main, approx. 4200 lineal feet of 2-inch and 3-inch lower pressure sewer in the City right-of-way, approx. 1160 lineal feet of 12-inch storm sewer, approx. 200 feet of 16-inch HDPE gravity sewer, demolition, abandonment of beach sewer laterals in place, grading, hot mix asphalt, cement concrete sidewalks, curbs, and gutters; electrical systems including service cabinets, electrical lines, and junction boxes; installation of utility conduits and vaults; installation of simplex and duplex grinder pump stations on private properties and in the City right-of-way, discharge piping, and associated appurtenances; and traffic control.

 

Location: bremerton, wa
Start/finish Date: march 2022 - July 2022
Contract: $2,324,998
Description: Contract consisted of improvements of Kitsap Way (SR 310) and Warren/Wheaton Avenue (SR 303) pavement markings, ADA ramps demolition and reconstruction, removal and replacement of traffic signal heads, installation bicycle signal detection, installation of illuminated street signs on existing signal arms, and traffic control.

 

Location: Tacoma, wa
Start/finish Date: february 2021 -
Contract: $6,605,605
Description: This Contract provides for the improvement and/or the construction of bike lanes, ADA-compliant curb ramps, pedestrian refuge islands, pedestrian crossings and midblock crossings, bicycle signal detection and APS, HAWK beacon system, electrical duct bank, 5500’ of 12” water main, sewer main replacement, stormwater upgrades, and grind and overlay.

 

Location: orting, wa
Start/finish Date: november 2021 - September 2022
Contract: $2,126,092.00
Description: The work required by the contract plans and specifications shall include, but is not limited to, all work as generally described: Orville Road Engineered Log Jam Setback Revetment Phase 2C Year 2, Project 1425: The work includes but is not limited to the following items of work, improvements along the left bank of the Puyallup River between River Mile 27.4 to 28.4 and includes the construction of (40) engineered logjams, consisting of driven un-treated timber piles, large wood, chain lashing, racking, slash, and dolos (8-ton precast concrete units). It also includes approximately 2,800 linear feet of existing levee removal, and the construction of an approximate 150 LF ‘Levee Terminus’ section consisting of large onsite salvaged levee rock.   THIS WAS THE 5TH AND FINAL PHASE OF THE ORVILE RD ELJ AND SETBACK REVETMENT PROJECTS- ACI PROCURED AND COMPLETED ALL 5 PHASES.